![]() ![]() The concrete should be 350 kg/m3 (standardized C125 430), or> 150 Kg/m2 for composite pools. Construction of a concrete slab for swimming poolsįor both ground pools and for inground or semi-underground pools, a 17 cm thick concrete slab for wooden pools and 15 cm for a composite pools will be necessary. Our recommendation is to make a concrete base with fibers or a welded mesh. – Prepare a concrete slab (cement…) according to the dimensions of the pool. – Directly on the ground, after preparation, leveling … as long as it’s stabilized ground, Regardless of the type of installation, it’s necessary to excavate and prepare the area. In addition to the location, we can install the pool according to the following options: Our advice is to mount the pool on a sunny day and avoiding windy days. The pool should be in a sunny place, easily accessible, and in an area free of pipes or electrical connections. When choosing the place where we will place the pool, we must take into account that it isn’t: The installation of composite or wooden pools requires the intervention of at least two people and requires two days, apart from the preparation of the area and filling. So you can move forward and not miss a day in the pool, we will briefly describe the steps necessary to fully enjoy the swimming season. The leftover soil can be sold, disposed of by a contractor, or repurposed for other projects, such as for plant beds.Installing a wooden or composite pool in the garden of your home can be a long and tedious process.Hire a contractor to take care of any utility lines needing to be moved. Make sure you have your permit and know about any utility lines in the ground.Some areas aren’t accessible to heavy equipment and have to be dug out the old-fashioned way. Use a spade or alternative digging tools. Dig out the soil by hand if you can’t get a backhoe.Remember that you can always put dirt back if you dig too far down. Make references for the deep and shallow end if your pool has them. For example, if your pool needs to be 6 ft (1.8 m), cut a 6 ft (1.8 m) pole to use as a reference.Use a tape measure or marked measuring sticks to keep track of the pool’s depth. Set the excavated soil away from the edge of the pool. Locate a rental company or hire a subcontractor to get the job done. The quickest way to do this is with a backhoe. 13 October 2020.ĭig out the soil to create the basic shape of the pool. Licensed Landscaper & General Contractor Expert Interview. In California, the required setback is 5 ft (1.5 m). Pool contractors look at an element called setback, or how far away your pool has to be from your property line.Keep it in sunlight to warm the water naturally. Put your pool above a slope so debris doesn’t wash into it during rainy days. The location you choose affects your pool.Ask them to send a technician to mark the location of your lines. Call your local utility companies for advice. Underground obstacles like utility lines are difficult to find without digging. ![]() To estimate the size of these features, calculate the size of your pool or how much water it will hold, then look for suitable products. Leave space for features like pump systems and diving boards. Think carefully about what you want out of a pool.Removing these obstacles takes additional time and money. Note any obstacles that will need to be removed, such as trees, rocks, fences, or even utility lines. A spacious backyard area is usually the best option. ![]() Find a place on your property with enough room for the pool. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |